LRFD: ( \phi_t = 0.75 ) → ( P_d = 0.75 \times 129.5 = 97.1 \text{ kips} ) ASD: ( \Omega_t = 2.00 ) → ( P_a = 129.5 / 2.00 = 64.8 \text{ kips} )
Given edge distance = assume 1.5 in (standard), spacing = 3 in, hole diameter = 1 in, thickness = 0.5 in. solution manual steel structures design and behavior
Check alternative staggered path through first hole in one leg then to hole in opposite leg? For L4×4, gage between legs (distance from back of one leg to center of holes in other leg) ≈ 2.5 in (AISC gage for angles). But given gage = 2.0 in, stagger term: ( s^2/(4g) = 3^2/(4 2) = 9/8 = 1.125 ). For one diagonal path: ( A_n = A_g - 2 (d_h t) + (1.125 t) ) = ( 3.75 - 1.0 + 0.5625 = 3.3125 \text{ in}^2 ) → larger than 2.75, so critical net area = 2.75 in². LRFD: ( \phi_t = 0
[ P_{n, yielding} = F_y \cdot A_g = 36 \cdot 3.75 = 135 \text{ kips} ] But given gage = 2
Gross shear length = ( 1.5 + 3 + 3 = 7.5 \text{ in} ) (from edge to last bolt). Net shear length = ( 7.5 - 2.5 \times d_h = 7.5 - 2.5 = 5.0 \text{ in} ) (since 2.5 holes along shear path? Actually 2.5 holes for two lines? Need precise – typical simplified: net shear area = ( (7.5 - 2.5*(1.0))*0.5 = 2.5 \text{ in}^2 ) per plane, two planes = 5.0 in²).